QUOTE LIST 0
Oil & Gas · 87,574 SKUs

Drilling, Completions & Workover Equipment

Wellheads, BOPs, tubulars, artificial lift, and fittings — new, rebuilt, or recertified — for drilling, completions, and workover operations.

87,574
Oil & gas SKUs
34 wk
Drill pipe S-135 lead time
6,482
Fittings & flanges SKUs
24 hr
Quote turnaround
Sector overview

What's driving oilfield procurement

A new quench-and-temper line at US Steel's Fairfield Tubular plant in Alabama is aimed squarely at relieving a domestic OCTG bottleneck for Permian, Eagle Ford, Haynesville, and Appalachia operators — a $475M bet that reflects how tight domestic tubular supply has been.

That tightness sits alongside a US rig count that's fallen roughly a third from its 2022 peak even as Lower 48 output hits record highs on longer laterals and completion efficiency — fewer rigs doing more work, which changes what equipment gets prioritized and how far out it's quoted. The weekly Baker Hughes rig count, published continuously since 1944, remains the standard reference point for near-term demand across this equipment.

The Drilling & Completions desk covers wellheads, BOPs, tubulars, artificial lift, and fittings — 87,574 SKUs across API 5CT/6A/7K/16A/Q1 specs, available new, rebuilt, or recertified.

BROWSE ALL OIL & GAS PARTS →
FAQ

Common questions

What's the current lead time for drill pipe?

S-135 drill pipe is quoting around 34 weeks industry-wide. Configure the exact spec for an indicative lead time.

What's included in the Drilling & Completions desk?

Wellheads, BOPs, tubulars, artificial lift, and fittings — 87,574 SKUs across API 5CT/6A/7K/16A/Q1 specs, new, rebuilt, or recertified.

Why is OCTG tubular supply tight right now?

Domestic capacity has been constrained industry-wide. US Steel's $475M Fairfield Tubular expansion in Alabama is aimed directly at relieving that bottleneck, reaching full output by 2029.

Popular categories

Top oil & gas families

OIL & GAS

Tubulars

1,456 SKUs
OIL & GAS

Fittings & Flanges

6,482 SKUs
OIL & GAS

Wellheads, BOPs & Downhole

87,574 SKUs total
Industry news & insights

What's moving in oil & gas

US Steel commits $475M to expand OCTG capacity in Alabama
OIL & GASJun 24, 2026

US Steel commits $475M to expand OCTG capacity in Alabama

A new quench-and-temper line at the Fairfield Tubular plant aims to relieve a domestic OCTG bottleneck for Permian, Eagle Ford, Haynesville, and Appalachia operators, reaching full output by 2029.

World OilRead article ↗
Halliburton posts stronger Q2 on North America recovery
OIL & GASJul 21, 2026

Halliburton posts stronger Q2 on North America recovery

Halliburton reported Q2 2026 revenue of $5.7 billion, beating estimates as North American stimulation and well-construction activity drove sequential growth, with North America revenue up 7% quarter over quarter.

World OilRead article ↗
OIL & GASUpdated weekly

The rig count: oilfield equipment demand's leading indicator

Published continuously since 1944, the Baker Hughes weekly rig count remains the standard reference point for near-term demand across drilling, completions, and production equipment.

Baker HughesRead article ↗

Running a drilling or completions program?

Paste your parts list — we match it against 87,574 oilfield SKUs, new, rebuilt, or recertified.

MATCH YOUR BOM →