Everything Voltfield has written down
Eighteen guides explaining how this equipment actually behaves, and seventeen equipment references covering what you can specify. No signup, nothing for sale.
Transformers & substation
How to Read a Transformer Nameplate
kVA ratings, cooling class codes, impedance, BIL and vector group: what every field means and which ones decide the rest of your design.
Pad-Mount vs GSU Transformers
They solve different problems and carry very different lead times. How to tell which one your application actually needs.
Why Transformer Lead Times Hit 3+ Years
What is driving the multi-year power transformer shortage, and how to sequence a project around it.
Switchgear & protection
Metal-Clad vs Metal-Enclosed Switchgear
How the standards define them, what sits inside each compartment, and why the distinction changes what you can safely work on.
Short-Circuit Studies & Breaker Coordination
What a short-circuit study calculates, why a quick fault-current estimate is not a substitute, and how coordination follows from it.
Arc-Flash Boundary Basics
What an arc-flash boundary is, how it relates to incident energy, and what NFPA 70E requires on equipment labels.
Grounding & Bonding Basics
They do two different jobs. What each actually does, and why the equipment grounding conductor is not the neutral.
Data center power & cooling
PUE Explained
The formula, what counts as facility power, typical ranges from 1.1 to 2.0, and what actually drives the number.
Liquid vs Air Cooling for AI Racks
Why GPU rack density is pushing data centers to liquid: direct-to-chip, immersion and rear-door heat exchangers compared.
Renewables & storage
Inverter Clipping & DC:AC Ratio
Why utility-scale solar oversizes the DC array on purpose, how clipping works, and the ratios typically used.
BESS Augmentation Explained
Why lithium capacity fades, how augmentation plans for it with phased DC block additions, and what that means contractually.
BESS Fire Safety: NFPA 855 & UL 9540A
What NFPA 855 requires for battery storage installations, and how UL 9540A test data sets separation distances.
Grid interconnection
The Grid Interconnection Process
What happens between filing a request and energizing: queue position, the study sequence, and where projects stall.
PJM Interconnection Timeline
How the PJM queue works: Transition Cycles, readiness requirements, and what Northern Virginia data-center load has done to it.
MISO Interconnection Timeline
How the MISO Definitive Planning Phase works, why cycles ran years behind schedule, and why sub-region matters.
ERCOT Interconnection Timeline
Why ERCOT sits outside FERC jurisdiction, how connect-and-manage differs, and why stability screening still bites.
Procurement & compliance
Buy America (BABA) for Procurement
What Build America, Buy America requires for IIJA-funded projects, and how it differs from the IRA domestic-content rules.
FEOC Compliance for Solar & Storage
What FEOC rules mean for procurement, what documentation to gather, and how they interact with domestic content.
Equipment references by sector
Each sector page covers the engineering behind the equipment; the pages beneath it go deeper on one equipment class.
Data Centers
Pad-mount vs GSU transformers, N/N+1/2N redundancy, switchgear, backup power and cooling.
Transformers · Switchgear · Backup Power · Cooling · Power Distribution · CablingRenewables
DC:AC ratio and clipping, fixed-tilt vs tracker, GSU transformers and collection systems.
Solar Inverters · DC Collection · AC CollectionBattery Storage
Duration and C-rate, grid-forming vs grid-following PCS, augmentation and fire safety.
PCS & Inverters · Enclosures · Balance of PlantOil & Gas
Wellheads, BOPs, OCTG tubulars, artificial lift and frac valves across API specs.
Industrial Supply (MRO)
Fasteners, raw materials, safety and PPE, tools, plumbing and electrical distribution.
Equipment deep-dives
Data Center Transformers
Pad-mount, large power, dry-type and K-rated compared, with indicative lead times.
Data Center Switchgear & Breakers
MV switchgear, LV switchgear, air circuit breakers and MCCBs.
Backup Power: Gensets & UPS
Diesel and gas gensets, turbines, static UPS and flywheel systems.
Data Center Cooling
CDUs, CRAH/CRAC units, rear-door heat exchangers and chillers.
Power Distribution: Busway & PDUs
Busway, floor PDUs, RPPs, static transfer switches and rack PDUs.
Cable & Busbar Sizing
MV and LV power cable, copper busbar and fibre trunks, with ampacity guidance.
Transformer Components
Bushings, tap changers, radiators, insulating fluid, core steel and winding conductor.
Switchgear Components
Instrument transformers, trip units, contact and arc-chute kits, enclosure hardware.
Genset Components
Engines, alternators, controls and governors, cooling, exhaust, fuel and starting.
Grounding & Bonding
Ground bars, exothermic connections, earthing kits and surge protective devices.
Monitoring & Controls
Revenue and power-quality metering, and the protective relays behind breaker operation.
Solar Inverters
String, central, commercial and hybrid PV inverters: ratings and MPPT granularity.
PV Combiners & DC Cable
String combiners, recombiners, PV wire and rapid shutdown at 1500V.
Solar AC Collection
Pad-mount step-up transformers, collector feeders and collector switchgear.
BESS Power Conversion (PCS)
Central, modular and grid-forming PCS, with UL 1741 SB considerations.
BESS Enclosures & Modules
Containerized enclosures, battery modules and fire protection.
BESS Balance of Plant
MV step-up transformers, collector switchgear, protection relays and station service.
Calculators explained
Each page covers the method, the formula, a worked example you can check against the tool, the governing standard, and what the calculation does not account for.
Voltage Drop
K-factor method, 3% / 5% design limits, conductor sizing.Transformer Sizing
kW to kVA, standard nameplate ratings, full-load amps.Available Fault Current
Short-circuit current at a transformer secondary from %Z.Arc-Flash Incident Energy
Incident energy and boundary, Lee method screening estimate.Ampacity & Conduit Fill
NEC Table 310.16 lookup and raceway fill limits.BESS Sizing
Load and duration to usable kWh, then to nameplate.Solar String Sizing
Temperature-corrected Voc and Vmp against inverter limits.Power Factor Correction
Capacitor bank kVAR to reach a target power factor.Motor Starting Voltage Dip
Bus dip from locked-rotor kVA against source stiffness.Transformer Inrush
Magnetizing inrush as a multiple of full-load amps.Ground Rod Resistance
Dwight’s formula from soil resistivity and rod length.Generator Runtime
Tank capacity against fuel consumption at real load.Data & tools
Lead-Time Index
Indicative lead times across every equipment family, with what is driving each one.
Spec Library
11,429 equipment configurations across 243 families: specifications, standards and indicative price bands.
Catalog Insights
Lead-time distribution and configuration mix across the whole reference set.
Glossary
The terms that show up on nameplates, drawings and submittals, defined plainly.
Free Tools
Calculators, a design sandbox, PCB tools and reference utilities. No signup.
Suppliers
Who builds this equipment, their lead-time posture, and the constraints behind it.